Please be advised that Rock Road at the Douglas Bridge was re-opened Friday, July 6, 2018 and will remain open for the a period of approximately 5 weeks. Following that the bridge will be closed for 2 weeks to facilitate the installation of expansion joints. Alternative detour routes will be posted  during lane closures.

For more information see the Notice of Construction (pdf – 2MB) or contact:

Ms. Kendra Reid, C.E.T.
Sr. Engineering Technologist
Engineering & Design
County of Peterborough
310 Armour Road
Peterborough, ON K9H 1Y6
Phone: (705) 775-2737 x 3202
Fax: (705) 749-2551
Email: Kendra Reid

Mr. Tashi Dwivedi, P.Eng.
Principle
HP Engineering
400-2039 Robertson Road
Ottawa, ON K2H 8R2
Phone: (613) 695-3737
Fax: (613) 680-2626
Email: Tashi Dwivedi